Drilling Systems - Nuclear Safe
769
page-template,page-template-full_width,page-template-full_width-php,page,page-id-769,theme-nilogics,woocommerce-no-js,ajax_fade,page_not_loaded,,qode_grid_1300,qode-content-sidebar-responsive,columns-4,qode-child-theme-ver-1.0,qode-theme-ver-1.0,wpb-js-composer js-comp-ver-7.8,vc_responsive
 

Drilling Systems

THE DRILLING PHASE OBJECTIVES
  • DRILL A VERTICAL WELL DOWN TO THE REPOSITORY ZONE AND THEN A  SERIES OF HORIZONTAL LATERALS INTO THE
  • SELECTED ZONES.
  • PREPARE THIS SET OF WELLBORES OR “MINI-TUNNELS” FOR DEPLOYMENT OF THE WASTE CONTAINERS.
  • Specialized Drilling Rig
  • Drill Vertical wellbore down to storage zone
  • Drill multiple lateral sections of storage segments of the well.
  • Prepare the wellbore by installation of steel casing and cemented sheath
  • Prepare for Installation of the nuclear capsule.
  • Prepare wellhead for maintenance and security
DRILLING INNOVATIONS
  • 3 D SEISMIC
  • STEERABLE DRILL BITS
  • HIGH CAPACITY RIGS
  • MULTI-LATERAL TECHNOLOGY
  • BOREHOLE TELEMETRY – (RADAR)
  • GEO-NAVIGATION (GPS)
  • MODERN SAFETY SYSTEMS (BOPS)
  • INTERNET TECHNOLOGIES
  • REMOTE INFORMATION PROCESSING
THE DRILLING RIG
TURNING THE CORNER
DOWNHOLE
TYPES OF DRILLING RIGS AND DOWNHOLE SCENARIOS IN OIL & GAS INDUSTRY
STACKED LATERALS FOR WASTE STORAGE Up To 2,000 Meters Long
EXTENDED
REACH
WELLS
EXTENDED
REACH
WELLS