THE DRILLING PHASE OBJECTIVES
- DRILL A VERTICAL WELL DOWN TO THE REPOSITORY ZONE AND THEN A SERIES OF HORIZONTAL LATERALS INTO THE
- SELECTED ZONES.
- PREPARE THIS SET OF WELLBORES OR “MINI-TUNNELS” FOR DEPLOYMENT OF THE WASTE CONTAINERS.
- Specialized Drilling Rig
- Drill Vertical wellbore down to storage zone
- Drill multiple lateral sections of storage segments of the well.
- Prepare the wellbore by installation of steel casing and cemented sheath
- Prepare for Installation of the nuclear capsule.
- Prepare wellhead for maintenance and security
- 3 D SEISMIC
- STEERABLE DRILL BITS
- HIGH CAPACITY RIGS
- MULTI-LATERAL TECHNOLOGY
- BOREHOLE TELEMETRY – (RADAR)
- GEO-NAVIGATION (GPS)
- MODERN SAFETY SYSTEMS (BOPS)
- INTERNET TECHNOLOGIES
- REMOTE INFORMATION PROCESSING
TURNING THE CORNER
DOWNHOLE
TYPES OF DRILLING RIGS AND DOWNHOLE SCENARIOS IN OIL & GAS INDUSTRY
STACKED LATERALS FOR WASTE STORAGE Up To 2,000 Meters Long