Timeline: NuclearSAFE Technology System

NuclearSAFE filed additional utility patent on high-level waste disposal technology systems.
NuclearSAFE expanding its operations internationally.
Technical Transfer meeting Dallas. Introduced the NuclearSAFE technology for deep geologic repository systems to Dr. Muller & Elizabeth Muller of the DeepIsolation group.
Development of Weapons Grade Plutonium patent by NuclearSAFE R & D.
Cumulative HLW accumulation on site is more than 70,000 MT worldwide.
Initial contact with Dr. Muller of DeepIsolation of Berkeley U. about sharing NuclearSafe technology at Berkeley University.
USDoE provides $35M for deep wellbore drilling project to analyze rock properties and drilling systems. Contractor is Batelle.
Finland plans to build a HLW disposal facility in underground mines 40 meters below the surface and capable;e of storing 6,500 MT at a cost of $4 Billion to open on 2023.
NuclearSAFE maintains R&D efforts in developing HLW capsule design and operations.
Canadian Deep Geologic Repository has started storage development process by seeking sites for developing permanent storage 500 meters below ground level.